Electric Convector

The electric convector is controlled to meet any remaining zone load not met by any other item of equipment in the zone that has a higher heating priority. The control is accomplished by taking the remaining zone load and dividing by the efficiency of the baseboard.

 

Name

This is a read-only label that is automatically generated by the software and which incorporates the name of the zone in which the convector is located.

Nominal capacity

This is the nominal or maximum capacity of the electric convector (in W).

Efficiency

This is the overall electrical efficiency of the convector. The zone load met by this unit is divided by the electrical efficiency to obtain the total electric energy used.

Operation

Availability schedule

This is the schedule that determines whether or not the component is available for each timestep of the simulation. A schedule value greater than 0 (usually 1 is used) indicates that the unit can be on during the timestep. A value less than or equal to 0 (usually 0 is used) denotes that the unit must be off for the timestep.